Field notes · no. 18

Why your proof times drift in November

The dough did not change. The room did. Here is what 140 bakeries' proofing logs say about the first cold month, and the two settings worth changing this week.

Every year around the second week of November, our support inbox fills with the same message: the plan said 2 hours, the dough needed 2 hours 40. Nobody changed the recipe. The starter is fine. So what moved?

What we measured

Bakehouse and Mill plans log proof room temperature and humidity every minute. We took the logs from every bakery that opted in to sharing anonymous data, from 1 October to 20 November, and lined them up against how long each batch actually took to proof.

fig. 4 · proof room temperature, oct to nov
26°24°22°20° 11 nov · heating off at night
dashed line is the 24° the plan assumed

The 2 degree problem

The average proof room lost a little over 2 degrees across six weeks. That sounds small. For a sourdough at 78% hydration it adds roughly a third to the proof. The plan was right in October and quietly wrong by mid-November.

Most late bakes were not late because of the bakers. They were late because the building got colder and nobody told the plan.

The bakeries that stayed on time had one thing in common: they let the plan read the room instead of using a fixed proof time.

What to change

  • Turn on live proof timing for every dough with a long final proof. Short proofs can stay fixed.
  • Move the room sensor to the middle shelf, away from the door. Sensors by the door read up to 3 degrees low.
  • If your heating switches off at night, add a 20 minute buffer before the first oven slot until March.

That is it. Two settings and a sensor on a better shelf. If you want us to look at your own logs, reply to any plan email and a baker on our team will go through them with you.

More field notes