Journal · Shed stories

How Kiln Street filled a shed in nine days

By Joss Adeyemi12 November 20266 min read
  • Drill
  • Ladder
  • Tent
  • Saw

When Rosa put a note through 60 doors asking "what's in your shed that you never use?", she expected maybe a dozen replies. By the end of the week she had 41, a spare door, and a neighbour offering to build the thing.

Start with a list, not a shed

The first lesson from Kiln Street: don't build anything until you know what's going on the shelf. Rosa made a shared list with three columns, and the rest of the street did the work.

  • What you could lend for a year
  • What you would borrow this month
  • What you would teach someone to use

The nine days

Day one was the list. Days two to four were a borrowed van and a lot of tea. By day six the shed had a floor, a roof and a code lock from our street-kit box.

"The best bit wasn't the tools. It was knowing who on the street can fix a bike."
Starting your own? The Street plan includes a shed volunteer on call for the first month, and we lend the van.

What went on the shelf first

Drills, two ladders, a pressure washer, a tent that sleeps six, a sewing machine and, oddly, three fondue sets. The fondue sets have been out every weekend since.

What we'd do differently

Label everything with the lender's name. People treat things better when they know whose they are, and lenders love seeing their old saw out on a job.

JA
Joss Adeyemi

Runs the shed on Lark Lane and writes the monthly shed letter.