Field notesNov 18, 20267 min read

How we got a flat fix down to 22 minutes.

We filmed 300 repairs, timed every step, and moved one shelf. Here's what actually made the van faster.

Tiago Mendes
Head of mechanics

In our first month, a rear flat took a median of 41 minutes from parking to riding away. Riders were happy. We weren't, because most of those minutes had nothing to do with the tire.

So we put a camera on the roof of three vans and timed every job for six weeks. Then we sorted every second into one of four buckets.

Where the minutes went

Finding parts
14m
The fix
9m
Parking
10m
Paperwork
8m
Median minutes per step, 300 rear flats, before the changes.

The repair itself was the smallest bucket but one. Mechanics spent longer digging for the right tube than fitting it.

Three changes

1. One drawer per wheel size

Tubes used to live by brand. Now they live by size, in the drawer nearest the back door, with the most common size at hand height. That alone took finding parts from 14 minutes to 3.

The fastest repair is the one where the part is already in your hand.

2. Park first, then call

Mechanics now text the rider when they've parked, not when they arrive. Riders walk down while the stand goes up, instead of after.

3. Pay before the van leaves the depot

The price is fixed, so we take the card when you book. At the curb there's nothing left to sign.

The result: a median of 22 minutes across 2,140 flats since September, and a 90 day promise that we've had to honor 31 times.

What's next

If you're a mechanic who likes this kind of thing, we're hiring in Porto.

Keep reading

Try the 22 minutes.