How we got a flat fix down to 22 minutes.
We filmed 300 repairs, timed every step, and moved one shelf. Here's what actually made the van faster.
Head of mechanics
In our first month, a rear flat took a median of 41 minutes from parking to riding away. Riders were happy. We weren't, because most of those minutes had nothing to do with the tire.
So we put a camera on the roof of three vans and timed every job for six weeks. Then we sorted every second into one of four buckets.
Where the minutes went
The repair itself was the smallest bucket but one. Mechanics spent longer digging for the right tube than fitting it.
Three changes
1. One drawer per wheel size
Tubes used to live by brand. Now they live by size, in the drawer nearest the back door, with the most common size at hand height. That alone took finding parts from 14 minutes to 3.
The fastest repair is the one where the part is already in your hand.
2. Park first, then call
Mechanics now text the rider when they've parked, not when they arrive. Riders walk down while the stand goes up, instead of after.
3. Pay before the van leaves the depot
The price is fixed, so we take the card when you book. At the curb there's nothing left to sign.
What's next
- Tubeless repairs on every van by spring
- A second drawer layout for cargo bikes
- Live arrival times accurate to two minutes
If you're a mechanic who likes this kind of thing, we're hiring in Porto.